How To Install Electric Meter Base
Homeowners however can install the meter base.
How to install electric meter base. The electrical meter is part of a meter loop which also contains a weatherhead and breaker box. Meter installation from pad mount transformer w vt pack 480v figure 15. Meter installation from pad mount transformer usi ng bushing type ct s figure 14b. There is also a connection lug for the grounding wire which is bonded to the center neutral bus bar.
American electric power company meter and service guide 4 figure 14. Make sure that clearances around the meter socket area are in line with recommended guidelines. Ground rods need to be installed in the ground outside in a spot where they can be hammered 8 feet 2 4 m into the ground. The nec or national electric code specifies that any electrical installation must comply with the residential code of the state where the installation is taking place.
Anatomy of an electric meter. Electrical meter boxes can be installed outdoors or indoors. Meter loops must be built and installed to specifications set by the power company. 480v delta or 277 480v wye 200 amp below service self contained metering with meter disconnect figure 16.
The customer is responsible for obtaining permits and inspec. Base of the post. Inside a standard household electric meter box there is a center neutral bus bar with wire connection lugs at each and two hot bus bars each with wire connections lugs at each end. The neutral bar is identified by a white marking or white electrical tape on the outer sheath.
There is no requirement for how close or far from a building they should go but be sure to pick a spot that is convenient to get to and where you will have space to. The placement of this assembly must be correct and allow the utility company access when they require it. Assemble the meter loop piping and base socket adhering to the regulations put in place by the supplying utility. Install the rod in a location near the electrical panel.
Cut about 3 4 inch of the insulation off and remove it to uncover the copper wires. The power company is responsible for bringing power to the site for installing the meter in the socket provided by the customer and for ener gizing the service. Installing new electric service is a joint project between the customer and the power company.